By accepting cookies you will be helping us to continue to provide you with the best possible service.
Read this article in 中文 Français Deutsch Italiano Português Español
22 November 2026
As colder temperatures, wetter conditions and longer periods of inactivity put powered access equipment under pressure, Leonard Marshall, Engineering Director at Loxam Nationwide Platforms, explains why correct winter storage and shutdown practices are critical to avoiding unnecessary downtime and ensuring machines are ready when work resumes.
As colder temperatures, wetter conditions and longer periods of inactivity put powered access equipment under pressure, Leonard Marshall, Engineering Director at Loxam Nationwide Platforms, explains why correct winter storage and shutdown practices are critical to avoiding unnecessary downtime and ensuring machines are ready when work resumes.
As winter picks up, powered access equipment is often exposed to a combination of colder temperatures, wetter conditions and longer periods of inactivity. While many sites continue operating throughout the season, others experience intermittent pauses, holiday shutdowns or reduced usage.
In these conditions, the way MEWPs are shut down and stored becomes critical. Poor winter management is a common cause of avoidable downtime, flat batteries, delayed starts and unnecessary call-outs when work resumes.
A machine that has been left incorrectly powered down can quickly become a problem. Emergency stop buttons left engaged, batteries left partially discharged, or controls exposed to frost and moisture can all prevent a MEWP from starting when it is next required.
These issues are rarely the result of mechanical failure. More often, they stem from simple end-of-shift practices that are easy to overlook during busy periods or just before a break.
Regardless of machine type, safe winter storage starts with choosing the right parking position. MEWPs should be left on firm, level ground, away from traffic routes and obstructions.
Booms should be fully retracted and lowered into the stowed position, with the turntable aligned between the non-steer wheels. Scissor lifts should be fully lowered before being powered down. In all cases, machines should be switched off using the key switch, with keys removed to prevent unauthorised use.
Emergency stop buttons at both platform and ground controls should be left in the released position. Leaving them depressed for extended periods is a common cause of power issues when machines are restarted as the contacts inside will freeze in the off position, preventing the machine from being turned on until fully defrosted.
Cold and damp conditions place additional strain on electrical components. Where possible, machines should be stored indoors or under cover to prevent rain and frost build-up on control panels.
If this isn’t feasible, even basic protection, such as covering the control box, can help reduce exposure. On some scissor lifts, removable top control boxes can be taken off and stored in a dry indoor space during extended shutdowns.
For electric and hybrid machines, keeping batteries fully charged is essential. Machines should be left on charge overnight when not in use, with battery water levels checked where appropriate. Allowing batteries to drain during cold weather significantly increases the risk of reduced performance or failure.
For diesel and hybrid machines, keep fuel tanks topped up and use clean filling containers. Checks on engine oil and water levels should be carried out daily and again prior to use.
When starting a diesel or hybrid engine, always use the glow plugs, leaving time for the glow plugs to heat up. If the engine does not fire up straight away, do not continue trying to start the machine, as you will simply kill the battery. In this instance, you should use the glow plugs for a further 30-45 seconds before trying to start the engine.
Once running, allow the engine to run for at least 15 minutes before operating, as the hydraulic oil may be cold and will slow down the machine operation until it gets to working temperature.
A common concern when equipment remains on site is unauthorised use. Modern telematics systems help address this risk directly.
With systems such as SkySentry enabled, machines can be remotely immobilised using a PIN-controlled lockout. Once activated, the equipment cannot be operated again without authorisation, even if it remains physically accessible on site. This allows contractors to keep machines in place without compromising security or accountability.
Combined with basic controls such as removing key switches at the end of use, this approach significantly reduces the risk of misuse during shutdowns or holiday periods.
Winter rarely causes problems on its own. Issues arise when machines are left unmanaged, unchecked or exposed for long periods.
By embedding good shutdown habits, protecting controls and batteries, and treating winter storage as part of normal site discipline, contractors can reduce breakdowns, avoid unnecessary delays and ensure MEWPs are ready to perform when needed.
KHL is the world’s largest and most-trusted provider of information for the global construction and power sectors. It is a professional B2B multi-platform media, events, data, research and digital powerhouse, that has greater depth and reach into the global industry than ever before.
Access Briefing
Crane & Transport Briefing
Construction Briefing
Demolition & Recycling International
International Rental News
COMPRESSORtech2
Power Progress
Off Highway Research – Market research
Unique marketing services that create demand for your products locally, regionally and globally
Marketing Services
Download Media Kits
